This contract is a sealed‑bid, public‑sector construction project to design‑build a new toilet and shower room at Union Station (WRA) in Worcester, MA. The work includes demolition of existing interior finishes, installation of plumbing, mechanical, electrical, fire‑protection, and interior finishes such as solid‑surface wall panels, tile, resinous flooring, and restroom accessories. The award was made to Kneeland Construction Corp. for an estimated contract price of roughly $128,500. The solicitation required a 5 % bid security, performance and payment bonds equal to the contract sum, compliance with prevailing‑wage statutes, MWBE participation goals, and a one‑year warranty.
• Scope: full interior renovation of a restroom facility with all trades (plumbing, HVAC, electrical, fire‑sprinkler, finishes).
• Procurement: open sealed‑bid (Full and Open Competition) with an extended bid deadline of 04/14/2023.
• Requirements: performance/pay‑roll bonds, insurance, prevailing‑wage compliance, MWBE goals, one‑year warranty, and strict safety/noise ordinances.