The State of Utah, Division of Facilities Construction and Management (DFCM), is requesting bids for the construction of two 2,800 SQFT resident houses at the Loa Fish Hatchery. The project includes the construction of two homes, with one on the north side and one on the south side of the property, connected to propane and septic systems. The contractor will need to coordinate with the County Health Department and the Design Team to obtain the necessary permits. The base bid includes all work outlined in the plans and specifications, and there are two additive alternates for the project. The bid submission date was February 18, 2025, and the completion date is August 29, 2025. The estimated construction cost is $900,000.00.
• The project includes the construction of two 2,800 SQFT resident houses.
• The homes will be connected to propane and septic systems.
• The contractor must coordinate with the County Health Department and the Design Team to obtain necessary permits.
• The base bid includes all work outlined in the plans and specifications.
• There are two additive alternates for the project.
• The bid submission date was February 18, 2025.
• The completion date is August 29, 2025.
• The estimated construction cost is $900,000.00.