The contract is for the reconstruction and widening of Sheridan Lake Road from Corral Drive to Catron Boulevard. The project includes channel grading, storm sewer installation, sidewalk construction, and grid block retaining walls. The bid results show a total of $19,000,000.00 for the advertising authority, with various bidders submitting their proposals. However, the exact vendor awarded the contract is not specified.
• The project includes reconstruction and widening of Sheridan Lake Road.
• The project includes channel grading, storm sewer installation, sidewalk construction, and grid block retaining walls.
• The bid results show a total of $19,000,000.00 for the advertising authority.
• Various bidders submitted their proposals, but the exact vendor awarded the contract is not specified.