The Oroville Park and Ride Lot Project involves the construction of an asphalt parking facility, including the installation of rock, accessibility compliant concrete sidewalks, ramps, and parking stalls, as well as electrical and overhead decorative lighting, storm drain and sanitary sewer systems, bicycle racks and lockers, signage, and striping. The project also includes irrigation and landscaping. The engineer's estimate for the project is between $250,000 and $500,000. The contract was awarded to four vendors: RJ Heuton Construction, Franklin Construction, BRCO Constructors Inc., and R&R Horn Contractors Inc. The key aspects of this contract include:
• Construction of an asphalt parking facility
• Installation of accessibility compliant concrete sidewalks, ramps, and parking stalls
• Installation of electrical and overhead decorative lighting
• Installation of storm drain and sanitary sewer systems
• Installation of bicycle racks and lockers
• Installation of signage and striping
• Irrigation and landscaping
• Engineer's estimate: $250,000 to $500,000
• Four vendors were awarded the contract