This municipal contract awards the design‑build of a new sidewalk (referred to as the “Old Shell TAP Sidewalk”) extending from Union Avenue to Hyland Avenue in Mobile, Alabama. The scope includes demolition of existing pavement, installation of a new concrete sidewalk, placement of 7,592 ft of 1½‑in. electrical conduit 2 ft deep, and supply/installation of light poles from King Luminaire. The solicitation required sealed bids, a 5 % bid bond (max $50,000), performance and labor bonds, prevailing‑wage compliance, and a minimum 30 % self‑performance by the contractor. The contract was competitively bid and ultimately awarded to Grant Nichols Construction for $280,803.80.
• Primary work: sidewalk construction, conduit installation, and light‑pole supply.
• Procurement: full and open sealed‑bid competition with bid‑bond and performance‑bond requirements.
• Key dates: bid opening revised to 12 Nov 2020; award amount disclosed as $280,803.80.
• Mandatory compliance: ALDOT disqualification rules, prevailing‑wage rates, and insurance/bonding provisions.