The City of Orlando has awarded a term contract to Cross Construction Services, Inc. for the demolition of residential and commercial structures. The contract has a duration of 3 years, with an option to renew. The contractor will be responsible for furnishing all labor, equipment, materials, and supervision necessary for the demolition, including removal and disposal of debris and grading. The contract also includes provisions for asbestos abatement and disposal. The contractor has provided references and certifications, including AHERA Trained Asbestos Supervisor and OSHA certifications. The contract value is estimated to be $3,232,428.75.
Some key points of the contract include:
• The contractor will be paid based on a unit price schedule, with prices ranging from $3.25 to $8.50 per unit.
• The contractor will be responsible for mobilization fees, which will not exceed $2,000.
• The contractor will be required to provide daily project reports, exposure logs, and sign-in/out logs.
• The contractor will be required to adhere to all federal, state, and local regulations while performing work at projects.
The contract also includes provisions for insurance, bonds, and indemnification.