The 2024 Road Rehabilitation project involves asphalt resurfacing on various city streets in Keene, New Hampshire. The work consists of cold planing existing bituminous surfaces, road leveling, adjusting utility structures, paving, pavement markings, traffic control, and other incidental tasks. The engineer's estimate for the project is $732,900.00. The contract was awarded to All States Construction and Bazin Brothers Trucking, with bid totals of $716,984.72 and $940,866.30, respectively.
• The project includes excavation, asphalt overlay, asphalt base, and asphalt drives.
• The project also includes adjusting catch basin frames and grates, sewer standpipe boxes, and manhole covers.
• The project requires mobilization and clean-up, as well as construction contingency allowance.
• The project has a retroreflective paint marking requirement for 4" and 12" lines.
• The project has a maintenance of traffic requirement.