This rebid seeks a construction contractor to perform exterior and interior renovations of the Les Paul Performance Center at the University of Michigan. The scope includes repairing, priming, and painting existing wood columns, fascia, and trim; replacing damaged wood elements; removing and replacing roofing systems (asphalt shingle and elastomeric membrane); refurbishing interior stage boards; and installing new metal drip edge and partial roof sheathing. Two optional alternates allow for full composition siding replacement and column replacement. The base bid total for the 12 primary line‑items is $304,048.39, with potential additional costs up to $689,734.37 if both alternates are exercised. Bids were received and opened on 16 May 2025. The project is a competitive rebid, with the University of Michigan as the procuring agency.
• Primary work: exterior wood repair/painting, roofing removal & replacement, stage board refurbishment.
• Optional alternates: full siding replacement and column replacement (10 units).
• Estimated contract value: approximately $304 k (base) to $690 k (max).