Awarded vendors
- RCS Mainline
- SA
Description
The Sheridan Lake Road Reconstruction - Utility, Wall & Sidewalk Breakout Project involves the construction of a common utility trench, a retaining wall, and a sidewalk. The project is being led by the City of Rapid City, with a bid contact of Sara Odden. The bid results show two bidders, RCS Mainline and SA, with base bids of $6,570,427.25 and $69, respectively. The engineer's estimate for the project is $5,111,000.00. Key aspects of the project include:
• Utility trench construction
• Retaining wall construction
• Sidewalk construction
• Bid contact: Sara Odden
• Bidders: RCS Mainline, SA
• Engineer's estimate: $5,111,000.00