The contract is for the rehabilitation of the wastewater system in Spring Camp and Klein Park for Harris County Precinct 3. The project includes the design, construction, and installation of a lift station, force main, and sanitary sewers. The contract was awarded to LMC Corporation for a total amount of $424,640. The project aims to reduce maintenance costs and prevent environmental hazards caused by the existing on-site sewage facility.
• The project includes the removal and disposal of existing chain link fence and gate at the OSSF.
• The project includes the removal of existing lift station #3 equipment, piping, electrical, and raise invert.
• The project includes the construction of a new lift station, including concrete pad, discharge piping, and valves.
• The project includes the installation of a 2-inch diameter sanitary sewer force main.
• The project includes the conversion of existing lift stations #1 and #2 to manholes.