This contract calls for the complete sanding, refinishing, and logo application of the wood gym floor in the Tedford Gymnasium at Illing Middle School. The work includes dust‑control measures, replacement of any damaged floorboards, application of athletic‑floor finish, painting of existing game lines, and duplication of the Kelly‑Gym logo. The contractor must provide all labor, equipment, dumpsters, and required permits, work within the stipulated 7:00 a.m.–3:30 p.m. schedule, and deliver a one‑year workmanship warranty.
• Scope: ~5,600 sq ft wood floor sanding, board replacement, finishing, line painting, logo replication.
• Schedule: Work to be completed by August 18 2018, with a mandatory pre‑proposal walk‑through on June 11 2018 and sealed‑bid submission due June 22 2018.
• Requirements: Full insurance coverage (minimum $1 M CGL, $5 M umbrella), compliance with OSHA, ADA, building codes, and provision of dust barriers and waste removal.