The contract is for the 2023 Misc. Sewer Rehabilitation project, which includes furnishing all materials, labor, tools, and equipment necessary to perform the work required. The project consists of miscellaneous sewer rehabilitation at 1211 and 1215 George Washington Way. The engineer's estimate for the project is between $34,000 and $47,000. The contract was awarded to Allstar Construction Group, Inc. and Double J Excavating, Inc.
• The project includes mobilization, project temporary traffic control, removal of structures and obstructions, site restoration, manhole installation, and asphalt patching.
• The contract is a restrictive bid, meaning that only qualified contractors who have been invited to bid by the City of Richland are eligible to submit bids.
• The bid submission date was August 16, 2023, and the bid opening date was also August 16, 2023.