This contract is for the removal, disposal, and repair of approximately 77,000 square feet of deteriorated pavement located at 1802 75th Street SW, Everett, WA 98203. The engineer's estimate for the project is $220,000.00. The contract was awarded to Fidalgo Paving & Construction, LLC. Some key aspects of the project include:
• Removal and disposal of deteriorated pavement
• Repair of the pavement
• The project is located at 1802 75th Street SW, Everett, WA 98203
• The engineer's estimate for the project is $220,000.00
• The contract was awarded to Fidalgo Paving & Construction, LLC.