Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Construction
  5. ›2024 Street Revitalization Project #2

Awarded contract·Village of Hoffman Estates·Illinois

2024 Street Revitalization Project #2

Won by A. Lamp Concrete Contractors, Inc.$4.3MSingle Award
Contract source

Awarded vendors

  • A. Lamp Concrete Contractors, Inc.

Description

This contract concerns the comprehensive revitalization of approximately 2.34 mi (12,349 ft) of municipal streets within the Village of Hoffman Estates. The work includes removal of existing pavement, curb, and gutter; installation of new curb and gutter; placement of new asphalt pavement; and associated civil‑engineering utilities such as storm‑sewer, water‑main, and sanitary‑sewer upgrades. The project is broken into more than 150 line‑item specifications covering tree and site preparation, soil and erosion control, aggregate sub‑grade, asphalt and concrete paving, demolition, utility installation, traffic control, and miscellaneous site work. The Village conducted an open competitive bidding process, received bids from seven local contractors, and ultimately awarded the contract to A. Lamp Concrete Contractors, Inc. for an estimated total of roughly $4.3 million. • Scope: pavement removal, new curb‑gutter, asphalt resurfacing, utility (storm‑sewer, water, sanitary) upgrades across 9 streets. • Procurement: open competitive bid; award to a single vendor after bid tabulation. • Estimated contract value: ~$4.3 M, based on the “As Read” total bid amount in the tabulation. • Timeline: bid documents made available March 4 2024; bid deadline March 18 2024; contract award date not disclosed. • Vendor: A. Lamp Concrete Contractors, Inc., a local concrete and civil‑construction firm.

Attached files

Key dates

Bids closed
3/18/2024

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
24‑00116‑00‑PV

Contract value

$4,330,000

The bid tabulation lists a total “As Read” amount of $4,327,461.05 for the entire project. This figure represents the combined unit‑price quotations from all vendors and is the most concrete monetary figure provided. Since the contract was awarded to a single vendor (A. Lamp Concrete Contractors, Inc.), the contract value is effectively that total amount. No other budget or funding figure appears in the notice‑to‑bid, so the best estimate is the $4.33 M figure from the tabulation, rounded to the nearest hundred‑thousand for reporting simplicity.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Broken Arrow·Oklahoma

Top match · 74%

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

North Carolina City of Greenville·North Carolina

73% match

2027 Street Rehabilitation & Preservation Project

Closes 11/23/2026Opened 10/27/2026

City of Lancaster·Texas

73% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

Texas City of San Antonio·Texas

73% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Aberdeen·South Dakota

72% match

Award for 2026 Street Maintenance Concrete Repair II

Rolling / TBD closeOpened 8/25/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

72% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Newberg·Oregon

72% match

River Street Rebuild 2027

Closes 11/9/2026Opened 10/12/2026

City of Madison·Wisconsin

72% match

Milwaukee St Recon

Closes 11/5/2026Opened 11/5/2026

City of San Antonio·Texas

72% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Texas City of San Antonio·Texas

72% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of Maple Grove·Minnesota

71% match

26-02 - Patrick's Ridge and Rush Creek Villas Area Street Rehab

Closes 2/1/2027Opened 12/2/2025

City of San Clemente·California

71% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

Texas City of San Antonio·Texas

71% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

NYS Rochester, City of·New York

71% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

Lucas County Engineer·Ohio

71% match

2026 Springfield Township O.P.W.C. Road Improvement Project, Phase 2

Closes 11/10/2026Opened 10/26/2026

City of Lowell·Massachusetts

71% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

Texas City of San Antonio·Texas

71% match

2027 Street Rehabilitation Package 5 – Overlay

Closes 12/8/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

71% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

City of Danville·Virginia

71% match

IFB-26-27-020 Neighborhood Street Resurfacing Program

Closes 12/3/2026Opened 10/22/2026

Texas City of San Antonio·Texas

71% match

2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of Madison·Wisconsin

71% match

W Mifflin St Plaza Recon

Closes 11/5/2026Opened 11/5/2026

City of Danville·Virginia

71% match

IFB-26-27-020-FY-2027 Neighborhood Street Resurfacing Program

Closes 12/3/2026Opened 10/22/2026

City of Ontario·California

70% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Pasadena·California

70% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Stillwater·Oklahoma

70% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026