The contract is for the renovation of the resident shower floor 4B at Kane Scott, which includes the furnishing and installation of an epoxy floor system. The contract was awarded to Allegheny Installations for a period of 122 days, from June 1, 2017, to September 30, 2017. The estimated cost of the contract is $18,500.00.
• The contract is for a specific project with a clear scope of work.
• The vendor is responsible for furnishing and installing the epoxy floor system.
• The contract has a fixed duration and end date.
• The estimated cost of the contract is provided.
• The contract is for a capital project, as indicated by the inclusion in the budget.