The contract is for the provision of Grinder Pump Stations, consisting of a Progressing Cavity Grinder Pump and a 4X8 Fiberglass basin. The contract was awarded to Trombold Equipment Co, with a period of contract from February 1, 2018 through January 31, 2019. The estimated cost of the contract is $50,000.00. The key aspects of the contract include the supply and installation of the Grinder Pump Stations, as described in the specifications. The contract is for a single year, with no indication of renewal. The main point of contact is Jason Sterner, who can be reached at [email protected] or (412) 350-3576.
• The contract is for the provision of Grinder Pump Stations.
• The contract was awarded to Trombold Equipment Co.
• The period of contract is from February 1, 2018 through January 31, 2019.
• The estimated cost of the contract is $50,000.00.
• The main point of contact is Jason Sterner.