The contract is for the site development of a salt shed and pole barn structure, including excavation, grading, gravel base courses, asphalt paving, and other related work. The engineer's estimate for the base bid is $302,000.00, and the bids submitted by Bazin Brothers and Pat Rawson are $333,235.00 and $374,000.00, respectively. The contract includes bid alternates for a concrete foundation, light pole and solar light, and other items.
• The contract includes site improvements for a proposed public works salt shed and pole barn structure.
• The scope of work includes excavation and grading, construction of gravel base courses, and asphalt paving.
• Bid alternates are offered for a concrete foundation, light pole and solar light, and other items.
• The engineer's estimate for the base bid is $302,000.00.
• The bids submitted by Bazin Brothers and Pat Rawson are $333,235.00 and $374,000.00, respectively.