The contract is for the asbestos abatement and demolition of the old airport terminal building, including the construction of a perimeter fence. The contract also includes the removal of silt fence, inlet protection, and temporary chain link construction fencing. The bidders were required to submit their bids by June 18, 2019, at 2:00 pm. The contract was likely awarded to one of the bidders, but the exact winner is not specified.
• The contract includes the demolition of the old airport terminal building, including asbestos abatement.
• The contract includes the construction of a perimeter fence.
• The contract includes the removal of silt fence, inlet protection, and temporary chain link construction fencing.
• The bidders were required to submit their bids by June 18, 2019, at 2:00 pm.
• The contract was likely awarded to one of the bidders, but the exact winner is not specified.