This contract covers a city‑wide rehabilitation program focused on ADA‑compliant curb ramps, sidewalks, curbs, gutters, and associated concrete infrastructure throughout Denver. The scope includes demolition of existing defective concrete elements, excavation (including compressed‑air and water excavation for tree root protection), installation of new concrete pavement ranging from 4‑ to 12‑inch thicknesses, high‑early‑strength concrete overlay, curb and gutter replacement, storm‑drain inlet protection, signage, traffic‑control services, landscaping restoration, and irrigation system work. The work is quantified in a detailed Statement of Quantities and is priced on a unit‑price basis, with an estimated contract value of roughly $2.7 million. The procurement was conducted through full and open competition with a 30 % small‑business participation goal, and the contract was awarded to Keeke Concrete, Inc. after the bid opening on March 12 2024.
• Demolition & removal of sidewalks, curbs, gutters, ramps, and related concrete structures.
• New concrete placement (4‑12 in.) plus high‑early‑strength concrete overlays and pigmenting.
• Ancillary work: drainage inlet protection, traffic control, landscaping/irrigation, and tree‑root excavation.
• Quantified via a Statement of Quantities (≈ 200 days of work) and unit‑price pricing.