This contract is for the replacement of flooring at Topeka West High School, specifically in the choir room and auxiliary gym lobby. The scope of work includes the installation of carpet tile and epoxy flooring. The contract was awarded to JP Construction, LLC, with a base bid amount of $41,785.00 and a grand total bid of $47,285.00. The contract also includes several alternates, including the replacement of flooring in the choir storage room and the provision of a secondary color for the epoxy floor.
• The contract is for a lump sum amount, with a total bid amount of $47,285.00.
• The scope of work includes the installation of carpet tile and epoxy flooring.
• The contract includes several alternates, including the replacement of flooring in the choir storage room and the provision of a secondary color for the epoxy floor.
• The contract was awarded to JP Construction, LLC.
• The point-of-contact person is Jesse Wilson, Director of Purchasing Services.