This public‑sector solicitation seeks a contractor to perform site‑work for the installation of relocatable Head‑Start classroom buildings at King Elementary School in Stockton, California. The scope includes earthwork, grading, utility stub installation, weed control, and a potential access‑way replacement, with three optional add‑ons. The bid tabulation shows a total base‑bid amount of $1,662,882, plus three alternates (utility stubs $117,000; weed control $29,300; replace NAE $10,000). The solicitation was issued and opened on February 1 2018, indicating a full and open competitive process. No award decision is recorded, and the agency is the San‑Stanislaus Unified School District’s Purchasing Department.
• Base‑bid total: $1,662,882 for site‑work and related construction activities.
• Alternates: Utility stubs, weed control, and access‑way replacement (optional).
• Procurement method: Full and open competition, public bid tabulation.
• Location: 655 West Benjamin Holt Drive, Stockton, CA 95207 (project site).
• No award or contract term details are provided in the excerpt.