This contract awarded by the City and County of Denver’s DOTI calls for the comprehensive replacement of traffic signal infrastructure at two intersections, encompassing demolition, civil works, paving, electrical and communication systems, signage, and associated landscaping. The scope includes removal of existing inlets, manholes, curbs, gutters, and signal equipment, followed by installation of new concrete pavement, curb and gutter, asphalt surfacing, LED luminaires, signal controllers, detection cameras, and full traffic‑control device packages. The project is funded under the Colorado Department of Transportation FY18 Highway Safety Improvement Program, with an awarded contract value of just over $3.09 million.
• Heavy‑civil and electrical work covering demolition, utility relocation, paving, and signal system installation.
• Required pre‑qualification at the $6 M heavy‑civil level and compliance with prevailing‑wage, insurance, and bid‑bond requirements.
• Single‑award to Goodland Construction, Inc., with a firm‑fixed‑price contract and a bid opening held on January 20 2026.