Description
This contract is for the site improvement of the Douglas Trail Substation, which includes site grading, perimeter screening wall, control building and systems, building foundation, and equipment foundations. The project involves the removal of curb and gutter, bituminous pavement, and concrete pavement, as well as the installation of new pavement, drainage systems, and other site improvements. The contract was issued by Rochester Public Utilities (MN) and the bid submission date was February 19, 2016.
• The project includes the removal of existing pavement and the installation of new pavement, including concrete and bituminous pavement.
• The contract includes the installation of drainage systems, including pipes, catch basins, and manholes.
• The project involves the construction of a control building and systems, including the foundation, walls, and roof.
• The contract includes the installation of equipment foundations, including the foundation for the substation equipment.
• The project requires the removal of existing vegetation and the installation of new landscaping, including trees, shrubs, and grass.