Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Logan Street/Hagen Road Construction Project

Awarded contract·City of Richland·Washington

Logan Street/Hagen Road Construction Project

Won by Premier Excavation Inc$3.8MSingle Award
Contract source

Awarded vendors

  • Premier Excavation Inc

Description

The Logan Street/Hagen Road Construction Project involves the construction of roadway excavation, placement of crushed surfacing, water and sewer main lines and services, new conduit placement, new storm drain systems, curb and gutter and curb return ramps, street light system, groundwater dewatering, wetland mitigation, tree removal and replanting, surfacing with hot mix asphalt, and site restoration. The project is estimated to cost $3,768,000.00. The contract was awarded through a competitive bidding process, and the City of Richland is the agency responsible for the procurement. Key features of the contract include: • The project involves the construction of various infrastructure components, including roads, utilities, and stormwater management systems. • The contract was awarded through a competitive bidding process, with multiple vendors submitting bids. • The City of Richland is the agency responsible for the procurement and administration of the contract. • The contract includes provisions for wetland mitigation and environmental protection. • The project is expected to have a significant impact on the local community, with potential benefits including improved infrastructure, enhanced public safety, and increased economic activity.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
16-0050

Contract value

$3,768,000

The contract value is estimated to be $3,768,000.00, based on the engineer's estimate provided in the contract documents. This estimate takes into account the various components of the project, including roadway excavation, utilities, and stormwater management. The actual contract value may vary depending on the final bid price and any changes or modifications that occur during the course of the project. Factors that may influence the contract value include the cost of materials, labor, and equipment, as well as any unforeseen site conditions or changes to the project scope.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 67%

Sharon Road at Eastburn Road Improvements

Rolling / TBD closeOpened 1/2/2026

City of Charlotte·North Carolina

67% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Ridgeland·Mississippi

67% match

West Jackson Street Corridor Demonstration Project

Closes 11/6/2026Opened 10/16/2026

Massachusetts Town of Barre·Massachusetts

67% match

FY27-06 Cutler Road Reconstruction

Closes 11/5/2026Opened 10/22/2026

City of Toledo·Ohio

66% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

City of Harrisonburg·Virginia

66% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Massachusetts City of Brockton·Massachusetts

66% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Charlotte·North Carolina

66% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

Massachusetts Port Authority (Massport)·Massachusetts

65% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Massachusetts City of Lowell·Massachusetts

65% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

City of Charlotte·North Carolina

65% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Lancaster·Texas

65% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

City of Fargo·North Dakota

65% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

City of Charlotte·North Carolina

65% match

Perth-Milton Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/15/2028

City of Blue Hill, NE·Nebraska

65% match

Blue Hill, NE, Blue Hill Railway St. Paving Improvements Railway St. – Saline St. to York St., Blue Hill, Nebraska – 2026

Closes 11/9/2026Opened 10/23/2026

City of Brandon·Mississippi

65% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

City of Richmond·California

65% match

CARLSON CROSSTOWN PROJECT PHASE II PROJECT NO. 23033

Closes 11/11/2026Opened 10/15/2026

Lexington County·South Carolina

65% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

Idaho Transportation Department·Idaho

65% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

Oregon City of Eugene·Oregon

65% match

2026 ITB 18 Lincoln St: 5th Ave - 13th Ave (Eugene)

Closes 11/3/2026Opened 10/8/2026

City of Brandon·Mississippi

65% match

ROAD STRIPING

Closes 11/6/2026Opened 10/7/2026

City of Mason·Ohio

65% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

Minnesota Department of Transportation·Minnesota

65% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

65% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

Lee's Summit R-7 School District·Missouri

65% match

Greenwood Elementary School Public Improvements Project

Closes 11/10/2026Opened 10/22/2026