The contract is for the replacement of the existing steel through girder bridge carrying Vanderhoof Road over the Tuscarawas River with a single span prestressed concrete box beam on semi-intergal abutments on drilled shafts. The project includes excavation, embankment, subgrade compaction, and other related work. The contract has a completion date of October 31, 2017, and a DBE requirement of 9%. The estimated cost of the project is $802,628.00.
• The project involves the replacement of a steel bridge with a prestressed concrete box beam bridge.
• The project includes excavation, embankment, and subgrade compaction work.
• The contract has a completion date of October 31, 2017.
• The DBE requirement for the project is 9%.
• The estimated cost of the project is $802,628.00.