This is a design‑build procurement for the complete replacement of the two existing bridges on Route 3 (north‑bound and south‑bound) crossing the North River at the Norwell‑Pembroke‑Marshfield corridor in Massachusetts. The award will be a lump‑sum contract covering all phases from detailed design, environmental permitting, demolition of the existing structures, construction of new single‑span bridges, roadway reconstruction, storm‑water upgrades, and post‑construction remediation. The project is valued at roughly $103 million and the contractor will be responsible for delivering a 75‑year design life bridge with a 100‑year service life, while maintaining traffic flow throughout construction.
• Full design‑build scope: civil, structural, geotechnical, traffic, environmental, and construction management.
• Required capabilities: accelerated bridge construction techniques, extensive permitting (NPDES, essential fish habitat), hazardous‑material handling, and coordination with local municipalities.
• Schedule: Performance period of 1,550 calendar days after Notice to Proceed; mandatory pre‑proposal meeting on July 28 2026; final technical and price proposals due November 13 2026.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.