The Senator Highway Improvement Project is a county‑funded, 5.7‑mile highway resurfacing and safety upgrade in Yavapai County, Arizona. The contract calls for a 2‑inch asphaltic concrete overlay, full‑depth pavement removal and replacement, extensive guard‑rail replacement, installation of new catch basins, mailbox pullouts, and comprehensive traffic‑control and marking work. The award was made to Asphalt Paving & Supply, Inc. following an open competitive bidding process, with a Notice to Proceed dated June 16 2025 and a contract duration of roughly 82 ten‑hour working days (≈ 144 calendar days).
• 2‑inch PG 64‑22 asphalt overlay on ~5.7 mi (≈ 13,130 tons)
• Guardrail removal (≈ 18,000 ft) and new W‑beam guardrail installation (≈ 15,300 ft) with 70 end treatments
• Full‑depth pavement removal/replacement (≈ 6,667 sq yd) and geogrid stabilization
• Installation of 2 concrete catch basins, mailbox pullouts, embankment curb work, and full pavement‑marking restoration
• Required performance, payment, and bid bonds; unit‑price bid schedule; ten‑hour work‑day schedule with a mandatory June 30‑July 3 shutdown.