The contract is for concrete work in various parks and recreation areas in Rapid City, South Dakota. The work includes pouring a concrete floor in a maintenance building, reconstructing a basketball court, constructing a sidewalk, and installing a picnic shelter with a concrete floor. The bid results show four bidders, with the lowest bid being $109,500.00 from Flat Rock LLC. The engineer's estimate for the project is $113,000.00.
• The project involves multiple sites, including Scott Mallow Park, Willow Park, and Canyon Lake Park.
• The bid results show that Flat Rock LLC had the lowest bid, but it is not clear if they were awarded the contract.
• The engineer's estimate for the project is $113,000.00, which is higher than the lowest bid.
• The project requires the construction of a picnic shelter with a concrete floor at Canyon Lake Park.
• The bid results show that three of the four bidders had a "yes" in the "Bond" column, indicating that they included a bond in their bid.