This master contract establishes a framework for providing instrument and control calibration, maintenance, and repair services to the East Central Regional Wastewater Treatment Facilities, administered by the City of West Palm Beach. The work includes routine preventive maintenance, troubleshooting, calibration of flow meters, pressure transducers, and other process control instrumentation critical to wastewater treatment operations. It is a competitive award process, with bids closed on October 22 2024 and the contract awarded on October 24 2024. The agreement is intended to ensure reliable operation of wastewater infrastructure through skilled technical support and timely service response.
• Scope: Instrument calibration, preventive maintenance, and repair for wastewater treatment plant control systems.
• Procurement: Full and open competition; bids submitted by qualified contractors.
• Agency: City of West Palm Beach acting on behalf of the East Central Regional Wastewater Treatment Facilities Operation Board.
Attached files
The award documents live at the source — open the contract source above to download them.