This municipal project involves renovating the fourth floor of the Skyline Center office building in Wilmington, NC. The work includes installing 225 linear feet of metal‑framed gypsum demising walls (base scope), relocating engineering devices, adding optional tenant‑fit‑out space, and installing interior finishes such as acoustic ceiling tiles, door veneers, and floor coverings (carpet tile or luxury vinyl plank). The contract will be awarded through a sealed‑bid, single‑prime process with a 5 % bid bond requirement and a mandated 14 % M/WBE subcontracting goal. The construction schedule is set for 120 calendar days from notice to proceed, with a 20‑day final completion period and liquidated damages of $385 per day for overruns.
• Base scope: 225 lf of 9‑ft metal‑framed gypsum walls, three entrances, sidelites, and three window units.
• Alternates: 1,840 sf tenant renovation (Suite D) and an extra 110 lf of demising walls.
• Interior finish specifications: maple‑veneer doors, Armstrong acoustic ceiling tiles, carpet tile @ $7/sf, LVP @ $8/sf, 4‑in resilient floor base.