The City of Mobile’s Municipal Enforcement Department issued an RFQ for the nuisance‑abatement demolition of structures located at 1622 Duval Street. The scope requires wet demolition of all existing structures, capping of sewer, water and gas lines, removal of debris, vegetation control, comprehensive erosion and sediment controls, and compliance with lead‑based paint and asbestos NESHAPs. The contractor must secure all permits, provide insurance, be enrolled in E‑Verify, submit before‑and‑after photos, and deliver a newspaper notice of final completion. The work must be completed within 30 calendar days of receiving a Notice to Proceed, with liquidated damages of $250 per day if delayed beyond the 15‑day grace period.
• Wet demolition of structures, footings, and slabs with hazardous‑material handling.
• Utility disconnection, capping, and site cleanup including vegetation and debris removal.
• Full environmental compliance (erosion control BMPs, lead/asbestos disposal, storm‑water management) and required documentation.