The contract is for the replacement of the medium voltage switchgear and the power factor and harmonics correction system at the National High Magnetic Field Laboratory. The construction manager will be responsible for minor project construction contracts, functioning as an independent contractor, and may be required to perform a project utilizing the Design/Build method of delivery. The selected firm's minimum bonding capacity should be $2,000,000. The contract has a three-year term with an option to renew for two additional twelve-month periods.
• The contract is for a specialized trade construction and maintenance services project
• The project includes the replacement of the medium voltage switchgear and the power factor and harmonics correction system
• The construction manager will be responsible for minor project construction contracts
• The selected firm's minimum bonding capacity should be $2,000,000
• The contract has a three-year term with an option to renew for two additional twelve-month periods