This contract concerns the design‑build construction of a large‑diameter sewer rehabilitation project (Phase 3A‑Part 1) in Hartford, Connecticut. The work includes up to 13,500 linear feet of cured‑in‑place pipe (CIPP) lining, 29,500 linear feet of CCTV inspection, 16,000 linear feet of heavy cleaning, reconnection of 500 active service laterals, approximately 200 linear feet of pipe replacement, installation of four precast manholes, and 720 linear feet of monolithic cementitious lining for manholes, together with all required labor, equipment, permits, and related accessories. A mandatory pre‑bid conference was held on March 6, 2024, and sealed bids were due by April 9, 2024. The Metropolitan District serves as the procuring agency, and the award was scheduled for December 12, 2024. No winner is identified in the provided data.
• Scope: CIPP lining, CCTV inspection, heavy cleaning, lateral reconnection, pipe replacement, manhole construction.
• Location: City of Hartford, CT.
• Procurement: Open competition ITB with sealed bids; award date 12/12/2024.
• Key dates: Available 2/28/2024, Pre‑bid 3/6/2024, Bid due 4/9/2024, Award 12/12/2024.
Attached files
The award documents live at the source — open the contract source above to download them.