Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›Large Diameter Sewer Rehabilitation Program Phase 3A, Part 1

Awarded contract·The Metropolitan District·Connecticut

Large Diameter Sewer Rehabilitation Program Phase 3A, Part 1

$5MAwarded 12/12/2024Single Award
Contract source

Description

This contract concerns the design‑build construction of a large‑diameter sewer rehabilitation project (Phase 3A‑Part 1) in Hartford, Connecticut. The work includes up to 13,500 linear feet of cured‑in‑place pipe (CIPP) lining, 29,500 linear feet of CCTV inspection, 16,000 linear feet of heavy cleaning, reconnection of 500 active service laterals, approximately 200 linear feet of pipe replacement, installation of four precast manholes, and 720 linear feet of monolithic cementitious lining for manholes, together with all required labor, equipment, permits, and related accessories. A mandatory pre‑bid conference was held on March 6, 2024, and sealed bids were due by April 9, 2024. The Metropolitan District serves as the procuring agency, and the award was scheduled for December 12, 2024. No winner is identified in the provided data. • Scope: CIPP lining, CCTV inspection, heavy cleaning, lateral reconnection, pipe replacement, manhole construction. • Location: City of Hartford, CT. • Procurement: Open competition ITB with sealed bids; award date 12/12/2024. • Key dates: Available 2/28/2024, Pre‑bid 3/6/2024, Bid due 4/9/2024, Award 12/12/2024.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
4/9/2024
Intent to award
12/12/2024
Awarded
12/12/2024

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237310
Solicitation №
2023B-04

Contract value

$5,000,000

The solicitation details indicate roughly 13,500 ft of CIPP lining, 29,500 ft of CCTV inspection, 16,000 ft of heavy cleaning, plus ancillary works (500 laterals, 200 ft pipe replacement, 4 precast manholes, 720 ft manhole lining, equipment, permits, etc.). Using industry benchmarks: • CIPP lining ≈ $150 / ft → $2.0 M • CCTV inspection ≈ $30 / ft → $0.9 M • Heavy cleaning ≈ $30 / ft → $0.5 M • Additional works (laterals, replacements, manholes, lining, mobilization) ≈ $1.5 M Summing these components yields an estimated contract value in the range of $4.5 M–$5.5 M. Accounting for contingencies, design fees, and overhead, a reasonable ballpark is about $5 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of Honea Path·South Carolina

Top match · 78%

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

U.S. Department Of Defense·Missouri

77% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City Utilities·Indiana

76% match

77441 - 2026 Sewer Rehabilitation #2 (Large Diameter)

Closes 11/19/2026Opened 10/29/2026

City of Ponca·Oklahoma

75% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of Albany·Georgia

75% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of West Des Moines·Iowa

73% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Connecticut Town of Fairfield·Connecticut

73% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Greenwood Metropolitan District·South Carolina

72% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Cincinnati·Ohio

72% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of Douglas·Wyoming

72% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of American Canyon·California

72% match

2026 Sewer Rehabilitation Project

Closes 4/1/2027Opened 9/17/2026

City of Des Moines - Iowa·Iowa

72% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Cincinnati - Purchasing Division·Ohio

71% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

City of Rosenberg·Texas

71% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

Orange County Sanitation District, CA·California

71% match

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026Opened 9/29/2026

Maryland Baltimore County Government·Maryland

71% match

21169 SX0 Bird River and Bengies Sewershed Rehabilitation

Rolling / TBD closeOpened 5/22/2025

City of Chula Vista·California

71% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026