Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Civil Engineering
  5. ›3-60 (Construction), Knott-Miller Holder Artesia Branch…

Orange County Sanitation District, CA·California

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026$5M – $15MInvitation for Bid
Get bids like this by emailBid source

Description

This opportunity is an Invitation for Bids (IFB) issued by the Orange County Sanitation District (OC SAN) for the “Knott‑Miller Holder Artesia Branch Rehabilitation” project (Project No. 3‑60). The work involves extensive rehabilitation of approximately 3,900 ft of sanitary sewer lines ranging from 18 in to 45 in in diameter, the construction of new 84‑in polymer‑concrete manholes, slip‑lining of a 45‑in inverted siphon with 24‑in HDPE pipe, rehabilitation of 37 existing manholes, installation of a new air‑jumper pipe, and associated temporary sewage handling, traffic control, and site restoration. The contract will require the contractor to provide all labor, equipment, materials, permits, and safety plans, and to coordinate closely with OC SAN to avoid service interruptions. Key deliverables include cured‑in‑place pipe (CIPP) lining, polymer‑concrete manhole construction, HDPE slip‑lining, de‑watering, storm‑water pollution control, and comprehensive testing and documentation. • Scope: sewer line rehabilitation, manhole construction/rehab, slip‑lining, HDPE pipe installation, air‑jumper installation, temporary flow bypass, traffic control, and site restoration. • Location: Multiple sites within the cities of Buena Park and La Palma, Orange County, California. • Required capabilities: experience with CIPP, HDPE slip‑lining, polymer‑concrete manhole fabrication, traffic management, environmental compliance (storm‑water permits), and coordination with multiple municipal agencies. • Contractual obligations: performance and payment bonds, safety program compliance, detailed mobilization and construction schedules, and submission of extensive submittals (design calculations, QA/QC plans, etc.).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Stephanie Reveles

[email protected]

(714) 593-7597

Key dates

Opened
9/29/2026
Questions due
10/20/2026
Closes
11/16/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
3-60 (Construction)

Budget estimate

$5,000,000 – $15,000,000

The bid package covers roughly 3,900 ft of sewer rehabilitation, 37 manhole upgrades, new 84‑in polymer‑concrete manholes, HDPE slip‑lining of an inverted siphon, and extensive site work (traffic control, de‑watering, environmental mitigation). Comparable municipal sewer‑rehab projects of this scale in Southern California typically range from $5 million to $15 million in total contract value, depending on material costs, labor rates, and the complexity of traffic/utility coordination. Assuming a mid‑range cost of $10 million, the contractor’s net earnings after overhead and profit (≈10‑15 %) would be roughly $1 million‑$1.5 million. Therefore a reasonable budget estimate for the contractor is $5 million – $15 million in total contract revenue.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

West County Wastewater·California

Top match · 85%

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Chula Vista·California

85% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

County of Hernando·Florida

84% match

Manhole and Sewer Lateral Rehabilitation, As Needed

Closes 11/30/2026Opened 10/28/2026

City of Alhambra·California

84% match

N2M26-94 SEWER MAIN REPLACEMENT PROJECT ON SIERRA VISTA AVENUE

Closes 11/5/2026Opened 10/8/2026

City of South San Francisco·California

84% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Philadelphia·Pennsylvania

83% match

PW Bid 2325 -SEWER RECONSTRUCTION and RELAY of WATER MAINS in S. CONESTOGA ST from LUDLOW ST to MARK

Closes 11/13/2026Opened 10/23/2026

Greenwood Metropolitan District·South Carolina

83% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Ponca·Oklahoma

83% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

Town of Oakland·Florida

83% match

Briley Avenue Septic-To-Sewer

Closes 11/19/2026Opened 10/15/2026

City of Riverside·California

83% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of American Canyon·California

83% match

2026 Sewer Rehabilitation Project

Closes 4/1/2027Opened 9/17/2026

City of Carlsbad·California

83% match

Vista/Carlsbad Reach VC-2 Manhole Rehabilitation Project

Closes 11/2/2026Opened 10/21/2026

Delaware County Regional Sewer District·Ohio

83% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of Austin·Texas

82% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

City of Opa-locka·Florida

82% match

ITB 26-1113200 Sewer Infrastructure Improvement Project

Rolling / TBD closeOpened 10/14/2026

Maryland Baltimore County Government·Maryland

82% match

23001 SX0 Long Quarter Interceptor Rehabilitation

Closes 11/12/2026Opened 9/19/2026

Housing Authority of Lafourche Parish·Louisiana

82% match

Replacement of Sewer Treatment Plant, Orange Grove Site LA-80-7 (C)

Closes 11/12/2026Opened 10/16/2026

Delaware County Regional Sewer District·Ohio

82% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

Connecticut Town of Fairfield·Connecticut

82% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

City of West Des Moines·Iowa

82% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Lynchburg·Virginia

82% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Plano·Texas

82% match

2026 Manhole Rehabilitation

Closes 11/18/2026Opened 10/21/2026

The Metropolitan Water District of Southern California·California

82% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Redlands·California

82% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Oregon Clackamas County·Oregon

82% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026