The contract is for the replacement of a failing septic system at 32 Dangle Ave. in Akron, Ohio. The work includes tying into the existing public sewer, pumping, and filling the existing septic system in accordance with local health department codes. The contract requires the contractor to provide a warranty and to carry a minimum of $2,000,000 in general commercial liability insurance and $1,000,000 in commercial auto liability insurance. The contract also requires compliance with Davis Bacon wage rates. The bid was awarded to Lockhart Concrete Co for $19,900.00.
• The contract requires a mandatory pre-bid meeting via Zoom due to COVID-19 restrictions.
• The contractor must attend the pre-bid meeting to submit a bid.
• The contractor must provide all necessary permits and inspections.
• The contractor must comply with all applicable local building codes and regulations.
• The contractor must provide a warranty for the work.
• The contract is subject to Davis Bacon wage rates.