The City of Roseville solicited bids for Trantex Thermoplastic Pre-Melters. The contract was awarded to two vendors: DTC and Statewide Traffic Safety & Signs. The bid summary sheet indicates that the total cost for DTC is $30,737.73 and for Statewide Traffic Safety & Signs is $37,874.13. The scope of work includes the provision of Trantex Thermoplastic Pre-Melters. Key points to consider are the bid bond requirement, which is not required, and the bid opening date, which was May 14, 2019.
• The contract is for the provision of Trantex Thermoplastic Pre-Melters.
• The bid bond is not required.
• The bid opening date was May 14, 2019.
• The contract was awarded to two vendors: DTC and Statewide Traffic Safety & Signs.
• The total cost for DTC is $30,737.73 and for Statewide Traffic Safety & Signs is $37,874.13.