This contract calls for the complete demolition of existing structures at 1017 Donald Street, Mobile, Alabama, using wet‑method demolition and full site clearing. The scope includes utility line capping, removal of debris (including tires, vegetation, and small trees), erosion and sediment control BMPs, handling of lead‑based paint and asbestos, and final site stabilization with top‑soil, seeding, and mulch. The contractor must also publish a single notice of final completion in a local newspaper and provide extensive close‑out documentation. The performance period is 15 calendar days after receipt of the Notice to Proceed, with a $250 per day liquidated‑damage penalty for overruns.
• Wet‑method demolition of all structures, footings, and slabs.
• Comprehensive environmental controls (BMPs, LBP/Asbestos handling, storm‑water compliance).
• Post‑demolition site stabilization and mandatory newspaper notice of final completion.