The City of Allentown is seeking a contractor for the Traffic Signal Improvement System Modification Project Phase 1A - Signal. The project involves various items such as mobilization, maintenance and protection of traffic during construction, 2 inch conduit, 3 inch conduit, trench and backfill, junction box, signal cable, and more. The contract was awarded to Telco, Inc. and Wyoming Electric & Signal, Inc. with a total bid price of $714,188.00 and $551,247.00 respectively. The scope of work includes installation, modification, and adjustment of various traffic signal equipment.
• The project involves multiple items, including mobilization, maintenance and protection of traffic during construction, and installation of various traffic signal equipment.
• The contract was awarded to two vendors, Telco, Inc. and Wyoming Electric & Signal, Inc.
• The total bid price for Telco, Inc. is $714,188.00, while the total bid price for Wyoming Electric & Signal, Inc. is $551,247.00.
• The scope of work includes installation, modification, and adjustment of various traffic signal equipment, such as controllers, conduits, and signal cables.