This contract awards a single‑vendor, stipulated‑sum demolition project for the nuisance‑abatement of the property at 2257 Clinton Street, Mobile, AL. The contractor must perform wet‑method demolition of existing structures, cap utility lines, remove all debris, implement erosion‑ and sediment‑control BMPs, handle potential lead‑paint and asbestos waste, and restore the site with seeding and mulching. The scope also includes required permitting, insurance, E‑Verify proof, and post‑completion documentation such as before/after photos and a newspaper notice of final completion. The contract imposes liquidated‑damage penalties of $250 per day for late completion beyond a 15‑day grace period after the 30‑day substantial‑completion deadline.
• Wet‑method demolition with full footings, slab, and debris removal.
• Utility caps, erosion control, lead‑paint/asbestos handling, and site restoration.
• Mandatory documentation, insurance, E‑Verify, and strict timeline with daily penalties for delay.