The contract is for the roof top unit upgrades at the Capital Federal Natatorium. The project includes the removal and replacement of existing rooftop heating and cooling units, as well as the installation of new unit heaters. The contract was awarded to Piping Contractors of Kansas (PCI) and SAMCO, with a total bid amount of $1,157,958.00 and $1,303,434.00 respectively. The scope of work includes the removal and replacement of two boilers, the installation of a new wall and pair of doors, and the provision of required demolition, materials, and labor.
• The contract includes a $25,000 allowance for contingencies, which may not be used without the owner's written consent.
• The project requires the installation of a wash-down, industrial rated unit heater with controls compartment sealed to the surrounding environment.
• The contract includes the removal and replacement of existing rooftop heating and cooling units, as well as the installation of new unit heaters.
• The scope of work includes the provision of required demolition, materials, and labor.
• The contract was awarded to two vendors, Piping Contractors of Kansas (PCI) and SAMCO.