This contract is for the construction of the HWWTP Influent Gravity Sewer, Phase 2 Cole Farm and Lower Becklesville Road. The project includes approximately 4,600 LF of 8-inch and 15-inch diameter sanitary sewer, as well as other construction requirements such as erosion and sediment control measures and maintenance of traffic. The cost estimate range for this project is $1,000,001 - $2,500,000. The contract was awarded to CJ Miller for $1,139,758.22. The key aspects of this contract include the construction of the sewer, the maintenance of traffic, and the control of erosion and sediment.
• The project consists of approximately 4,600 LF of 8-inch and 15-inch diameter sanitary sewer.
• The project includes two jack and bore roadway crossings.
• The project requires erosion and sediment control measures.
• The project requires maintenance of traffic.
• The cost estimate range for this project is $1,000,001 - $2,500,000.
• The contract was awarded to CJ Miller for $1,139,758.22.