This contract calls for the complete wet demolition and debris removal of a structure located at 1801 Pake Avenue, Mobile, AL, including utility disconnections, erosion‑control measures, hazardous‑material handling, and site‑stabilization with seeding and mulching. The work must be performed within a tight 15‑day window after the contractor receives a Notice to Proceed, and the contractor is responsible for all permits, insurance, and documentation required by the City of Mobile’s Municipal Enforcement Department. The award was made to a single vendor, FREMIN VENTURES, LLC., under a stipulated‑sum (fixed‑price) arrangement, with liquidated‑damages provisions for any delay beyond the stipulated period.
• Wet demolition (including footings, slabs, CMU, etc.) with dust‑control to mitigate lead‑based paint and asbestos risks.
• Full utility capping, erosion/sediment control, hazardous‑waste disposal, and permanent site stabilization (top‑soil, seed, mulch).
• Required post‑completion documentation: photographs, waste‑shipment records, AIA payment applications, and a newspaper notice of final completion.