This contract is for the replacement of the Rio Linda Boulevard Bridge over North Channel Dry Creek. The project includes the furnishing of all labor, materials, and equipment for replacing the existing structurally deficient bridge with a new 60-foot long and 40-foot wide two-span precast bridge. The estimated contract cost for this project is $1,757,000, and the bid price from MCM Construction, Inc. was $1,068,680.50. The project is funded from the federal HBP and the County Road Fund. The work includes clearing and grubbing, habitat restoration, irrigation, rock slope protection, pavement grinding, tree removal, roadway excavation, bridge demolition, roadway approach work, aggregate base, asphalt pavement, traffic striping, bridge construction, and installation of metal beam guard rail and bridge railings.