Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›OPHIR ROAD FDR-C REHABILITATION PROJECT

Awarded contract·County of Butte - Public Works·California

OPHIR ROAD FDR-C REHABILITATION PROJECT

Won by Knife River Construction +3 more$1.2MMultiple Award
Contract source

Awarded vendors

  • Knife River Construction
  • Lamon Construction Co., Inc.
  • Teichert Construction
  • Franklin Construction, Inc.

Description

The Ophir Road FDR-C Rehabilitation Project involves the rehabilitation of Ophir Road in Butte County, California. The project includes slurry sealing, pulverizing, full depth reclamation, paving, striping, replacement of traffic loops, signage, and roadway reflectors, new pedestrian ramps, and minor roadway excavation. The contract was awarded to four vendors: Knife River Construction, Lamon Construction Co., Inc., Teichert Construction, and Franklin Construction, Inc. The engineer's estimate for the project was $1,269,171.00, and the bid amounts ranged from $1,118,340.87 to $1,280,280.00. • The project location is from Lincoln Boulevard to Lower Wyandotte Road in Butte County, California. • The project includes various contract items such as mobilization, traffic control, and pavement conform grinding. • The vendors have listed various subcontractors for the project, including Pavement Coatings, Pacific Excavation, and Centerline Striping. • The contract documents include bid sheets, plans, and specifications for the project.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
2019-03

Contract value

$1,200,000

The contract value can be estimated based on the bid amounts provided in the contract documents. The bid amounts range from $1,118,340.87 to $1,280,280.00, with the engineer's estimate being $1,269,171.00. Considering the bid amounts and the engineer's estimate, a reasonable estimate for the contract value would be around $1,200,000.00. This estimate takes into account the various contract items, including mobilization, traffic control, and pavement conform grinding, as well as the subcontractors listed for the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Transportation·North Dakota

Top match · 67%

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of Transportation·Colorado

66% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

Georgia Bulloch County Board of Commissioners·Georgia

66% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

U.S. Department Of Defense·Missouri

65% match

ODF-T FY26 Bledsoe Ferry Rehabilitation Project

Closes 10/31/2026Opened 8/31/2026

U.S. Department Of Defense·Missouri

65% match

ODF-T FY26 Bledsoe Ferry Rehabilitation Project

Closes 10/31/2026Opened 8/31/2026

City of Seattle·Washington

65% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

NYS Suffolk County·New York

65% match

Federal Aid Resurfacing of CR 83, Patchogue-Mt. Sinai Road from the Vicinity of NYS 112 to the Vicinity of Canal Road, Town of Brookhaven

Closes 11/12/2026Opened 10/1/2026

NYS PRIDE of Ticonderoga·New York

65% match

RFP Opportunity - Rehabilitation of 85 & 105 Montcalm Street

Closes 11/5/2026Opened 10/15/2026

City of Fargo·North Dakota

64% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Georgia Savannah Airport Commission·Georgia

64% match

SAC 30639 Gulfstream Road and James Blackburn Drive Rehabilitation

Closes 11/10/2026Opened 10/5/2026

U.S. Department Of Defense·Illinois

64% match

Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

64% match

Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Closes 11/23/2026Opened 10/22/2026

City of Cedar Rapids·Iowa

63% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

City of Fort Wayne·Indiana

63% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

63% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

Raleigh Durham Airport Authority·North Carolina

63% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

North Carolina City of Greenville·North Carolina

63% match

2027 Street Rehabilitation & Preservation Project

Closes 11/23/2026Opened 10/27/2026

Municipality of Anchorage·Alaska

63% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

63% match

STSRR PROJECT 21-7 STREETS IN TARA,OXFORD,SHERWOOD FOREST, DARRYL,BARD

Closes 11/3/2026Opened 10/6/2026

U.S. Department Of Transportation·Washington

63% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

NYS PRIDE of Ticonderoga·New York

63% match

NYS CDBG Residential Rehabilitation Project

Closes 11/16/2026Opened 10/23/2026

Idaho Transportation Department·Idaho

63% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

U.S. Department Of Veterans Affairs·Tennessee

63% match

Nashville National Cemetery FCA Deficiency Corrections

Closes 11/5/2026Opened 10/18/2026

City of Broken Arrow·Oklahoma

63% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

U.S. Substance Abuse and Mental Health Services Adminis·United States of America

63% match

First Responders-Comprehensive Addiction and Recovery Act

Rolling / TBD closeOpened 10/30/2026