The contract is for the construction of a gravity sewer system, including the installation of sewer mains, laterals, and trench replacement. The project requires prevailing wages to be paid to workers and includes a "good faith" effort to attract Disadvantaged Business Enterprises (DBE). The contract was awarded to Rados, with a total bid amount of $2,688,000. The project includes various items such as construction layout and staking, traffic control, clearing and grubbing, and more.
• The contract requires the installation of 10", 8", and 6" SS pipes, as well as 4" SS lateral pipes.
• The project includes trench bracing, installation of manhole connections, and contingency allowance for unstable trench conditions.
• The contract has a total of 19 items, with unit prices ranging from $12.00 to $425,600.00.
• The contract requires the contractor to take steps to attract DBE's and to pay prevailing wages to workers.
• The project is located in Chico, California, and the contract was published by the City of Chico.