The City of Edgewater awarded a public‑works contract to construct a multi‑use, ADA‑compliant trail spanning approximately 1.25 mi between Dale Avenue and 10th Street. The scope includes asphalt paving, drainage structures, boardwalks over wetlands, concrete curbs, detectable warning surfaces, signage, and associated site work such as clearing, grading, and utility coordination. The project is funded through a City grant tied to the Florida DOT “Shared Use Non‑motorized (SUN) Trail Network Program” and is subject to extensive environmental protections, including gopher‑tortoise burrow surveys and wetland buffers. The contract is a unit‑price agreement valued at roughly $0.9 M, with a 150‑day substantial‑completion schedule plus 30 days for final completion. Key points:
• Construction of 1.25 mi, 8‑12 ft wide asphalt trail with boardwalk sections.
• Required FDOT pre‑qualification, extensive wetland and species protection, and compliance with local, state, and federal regulations.
• Unit‑price schedule of values covering earthwork, paving, drainage, curb & gutter, signage, landscaping, and boardwalk structures.