The Four Rivers Sanitation Authority contracted N‑Trak Group, LLC to repair the North Rockton Avenue trunk sewer (Capital Project 2335). The work includes removal and replacement of sanitary sewer pipes (18‑in. and 8‑in. sections), a sanitary manhole, storm‑sewer pipe (36‑in. RCP), rock excavation, temporary bypass pumping, pavement and fence removal, tree clearing, and site restoration with seeding. All work must comply with IDOT specifications, Illinois prevailing‑wage rules, OSHA safety standards, and FRSA’s quality‑control procedures. The contract requires a 10 % bid bond, a 100 % performance bond, and specified insurance coverages. Liquidated damages of $300 per day apply for missed completion dates, with the overall project deadline of September 15 2022.
• Sanitary sewer replacement (70 LF of 18‑in., 8 LF of 8‑in.)
• Storm‑sewer (36‑in. reinforced concrete) and related utility work
• Rock excavation, bypass pumping, HMA pavement removal, fence and tree removal, and site seeding
• Strict regulatory compliance (Prevailing Wage, ADA, OSHA, Clean‑Construction, Steel Products Act) and performance guarantees.