This contract concerns the wet demolition and site‑clearing of all structures located at 1261 Glennon Avenue, Mobile, AL. The contractor must remove buildings, footings, utility lines, debris, and vegetation, while implementing erosion‑control BMPs, handling lead‑based paint/asbestos per hazardous‑material protocols, and stabilizing the site after demolition. The work must be completed within 15 calendar days of receiving a written Notice‑to‑Proceed, and the contractor is responsible for all permitting, insurance, and post‑completion documentation, including a newspaper notice of final completion and lien releases.
• Wet demolition of structures, footings, and underground elements.
• Utility disconnection and capping, debris removal, and vegetation clearing (≤ 8 in. caliper).
• Erosion‑control BMPs, hazardous‑material handling, site stabilization, and required close‑out paperwork.