This contract involves the demolition and full site remediation of a nuisance‑abated property located at 5671 Bob Street, Mobile, AL. The City of Mobile Municipal Enforcement Department required wet demolition, utility capping, thorough site cleanup, erosion‑control BMPs, and handling of lead‑based paint and asbestos waste, with all costs to be included in a single stipulated‑sum bid. The work must be completed within 30 calendar days of receiving a Notice to Proceed, with liquidated damages of $250 per day for delays.
• Wet demolition of all existing structures, including footings and slabs.
• Required utility disconnection and capping (sewer, water, gas).
• Comprehensive erosion‑control, site stabilization, and hazardous‑material disposal.
• Mandatory documentation, before‑and‑after photography, and final newspaper notice of completion.