The Inglewood Lift Station Bypass Project involves the installation of a bypass pipeline to allow for pumping from the lift station's wet well into the existing 18-inch DI force main, while bypassing the lift station facility. The project includes the installation of approximately 220 feet of 12-inch HDPE IPS, DR 17 pipeline, a bypass vault assembly, and other related work. The engineering estimate for the project is $161,000. The contract was awarded to Gary Harper Construction, LLC and Westerlund Excavation LLC. The scope of work includes mobilization, cleanup, and demobilization, trench safety system, TESC measures, bypass vault assembly, 18x12 wet tap, 12-inch HDPE pipe installation, and other related items.
• The project requires the installation of a bypass pipeline to allow for pumping from the lift station's wet well into the existing 18-inch DI force main.
• The project includes the installation of approximately 220 feet of 12-inch HDPE IPS, DR 17 pipeline.
• The project requires the installation of a bypass vault assembly and an 18x12 wet tap.
• The project includes the installation of 12-inch HDPE pipe and related appurtenances.
• The project requires the restoration of the existing asphalt road.