Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Inglewood Lift Station Bypass

Awarded contract·Sammamish Plateau Water & Sewer District·Washington

Inglewood Lift Station Bypass

Won by Gary Harper Construction, LLC +1 more$175kMultiple Award
Contract source

Awarded vendors

  • Gary Harper Construction, LLC
  • Westerlund Excavation LLC

Description

The Inglewood Lift Station Bypass Project involves the installation of a bypass pipeline to allow for pumping from the lift station's wet well into the existing 18-inch DI force main, while bypassing the lift station facility. The project includes the installation of approximately 220 feet of 12-inch HDPE IPS, DR 17 pipeline, a bypass vault assembly, and other related work. The engineering estimate for the project is $161,000. The contract was awarded to Gary Harper Construction, LLC and Westerlund Excavation LLC. The scope of work includes mobilization, cleanup, and demobilization, trench safety system, TESC measures, bypass vault assembly, 18x12 wet tap, 12-inch HDPE pipe installation, and other related items. • The project requires the installation of a bypass pipeline to allow for pumping from the lift station's wet well into the existing 18-inch DI force main. • The project includes the installation of approximately 220 feet of 12-inch HDPE IPS, DR 17 pipeline. • The project requires the installation of a bypass vault assembly and an 18x12 wet tap. • The project includes the installation of 12-inch HDPE pipe and related appurtenances. • The project requires the restoration of the existing asphalt road.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237110
Solicitation №
c16011

Contract value

$175,000

The contract value can be estimated based on the bid results table. The total bid amount for Gary Harper Construction, LLC is $146,350.00, and the total bid amount for Westerlund Excavation LLC is $193,370.00. The engineering estimate for the project is $161,000. Based on this information, the contract value can be estimated to be around $150,000 to $200,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Lino Lakes·Minnesota

Top match · 60%

Lift Station #53 Rehabilitation

Closes 11/5/2026Opened 10/14/2026

Village of Cary·Illinois

59% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

City of Wilton Manors·Florida

59% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

City of Laguna Beach·California

58% match

Old Top of the World Lift Station Rehabilitation - Phase II

Closes 11/10/2026Opened 10/9/2026

City of League City·Texas

58% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Mandeville·Louisiana

57% match

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

57% match

Avondale South Lift Station Generator & Avondale North Lift Station

Closes 11/19/2026Opened 10/7/2026

City of Wilton Manors·Florida

57% match

Lift Station No. 7 Replacement

Closes 11/23/2026Opened 10/22/2026

League City·Texas

57% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Austin·Texas

56% match

Gregg Manor Subdivision Lift Station (SER-5219R2)

Rolling / TBD closeOpened 8/3/2026

City of Orlando·Florida

56% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

U.S. Department Of Health And Human Services·South Dakota

56% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

City of Wilton Manors·Florida

56% match

Lift Station No. 4 Replacement

Closes 11/10/2026Opened 10/8/2026

City of Opa-locka·Florida

55% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

Louisiana City of Mandeville·Louisiana

55% match

LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/25/2026Opened 10/14/2026

Metropolitan Council·Minnesota

55% match

Notice of Intent to Solicit Blue Line Franklin Station Renovation

Closes 11/20/2026Opened 10/14/2026

City of Lake Charles·Louisiana

55% match

CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK‑UP POWER IMPROVEMENTS

Closes 11/17/2026Opened 10/22/2026

Midway City Sanitary District·California

55% match

Brookhurst Lift Station Improvement Design Project

Closes 12/18/2026Opened 10/12/2026

City of West Palm Beach·Florida

55% match

Flagler Drive Lift Station Retrofits (Lift Station No. 3 and Lift Station No. 40)

Closes 11/30/2026Opened 10/22/2026

City of DeLand·Florida

55% match

DOWNTOWN RELIEF LIFT STATION

Closes 11/10/2026Opened 10/9/2026

Texas University Of Houston·Texas

55% match

Lift Station & Trap Maintenance Services FY27

Closes 11/9/2026Opened 10/19/2026

City of Inglewood·California

55% match

Pressure Washing and Bus Shelter Cleaning Services

Closes 11/4/2026Opened 9/3/2026

City of Charlotte·North Carolina

55% match

Ashe Plantation Lift Station 2

Rolling / TBD closeOpened 5/1/2027

Louisiana Regional Transit Authority·Louisiana

55% match

Material Lift Elevator Replacement

Closes 11/12/2026Opened 10/26/2026

City of DeLand·Florida

54% match

Lift Station #10 Relocation

Closes 11/18/2026Opened 10/13/2026